Equipment, structure erection of Circulating Fluidized Bed Boiler 2x35T/H
- Erecting and dismantling scaffolding.
- Erection of steel structure.
- Install electrostatic precipitator.
- Install and align the fan.
- Install and align the pump, etc
Other Projects
WHR Turbine - Generator Overhaul
Removal, sanitary cleaning, island working surface the Element Baskets air dryer GAH furnace 1
Coating to restore neck shaft 1,2 Turbine
Repairing Boiler and auxiliary equipment
Online leaking sealing for valve body 3" class #2500