Overhaul for Turbine and Generator - Unit S1
Repair, maintenance, overhaul of turbines, generators and auxiliary equipment of Unit 1:
- Turbine repair and maintenance.
- Maintenance of 60MW generator.
- Repair and maintenance of steam turbine regulation valve system.
- Repair and maintenance of steam extraction valve system.
Other Projects
Repairing Boiler and auxiliary equipment - 2022
Cleaning the outlet pipes of pump 14P203
Overhaul of Residual Heat Boiler No. 1
Installing bucket elevator, fans - Line 3
Heat exchanger flanges re-surfacing