Online leak repair for of reduce temperature line Furnace 1

  • Survey, calculate data, design, process and manufacture Clamp.
  • Install clamp, glue injection for online leak sealing of reduce temperature line.

Pipe line parameters:

- Pressure: 100 bar.

- Temperature: 200 degrees Celsius.

Online leak repair for of reduce temperature line Furnace 1

Leak point before repair - An Khanh Thermal Power Plant

Online leak repair for of reduce temperature line Furnace 1

The leak point was completely sealed after repairing - An Khanh Thermal Power Plant

Other Projects

Supplying flange facing, manpower supply service

Supplying flange facing, manpower supply service

View more
Repair and replace the roller bearings supporting the drying drum

Repair and replace the roller bearings supporting the drying drum

View more
Manpower, equipment supplying to perform painting and sandblasting services

Manpower, equipment supplying to perform painting and sandblasting services

Dynamic balancing for pump impeller 022-P-216A

Dynamic balancing for pump impeller 022-P-216A

View more
Repair, maintenance, replacement of fan bearings

Repair, maintenance, replacement of fan bearings

View more
Turbine Overhaul ST01101 - Gas Generation Plant

Turbine Overhaul ST01101 - Gas Generation Plant

View more